Skip to content

Border Blogs & News

Blogs and news from the borders of America.

Menu
  • Home
  • El Paso News
  • El Paso Herald Post
  • Fronterizo News
Menu

KTSM News – TxDOT road closures for Feb. 21, 2025

Posted on February 21, 2025

EL PASO, Texas (KTSM) – The Texas Department of Transportation (TxDOT) El Paso has released a list of road closures for the week of Feb. 21, that could affect your commute.

I-10 Widening West

Sunday, Feb. 23, through Thursday, Feb. 27 from 9 p.m. to 5 a.m.

  • South Desert Boulevard will be closed south of Redd Road.
    • DETOUR: Turn right on Redd Road, left on Doniphan, left on Thorn Avenue.

Crews will be constructing a retaining wall.

Monday, Feb. 24, through Saturday, March 1 from 9 a.m. to 4 p.m.

  • I-10 East and West will be alternatingly reduced to one lane between Vinton Road and Transmountain Road.

Crews will be hauling dirt.

Monday, Feb. 24, through Saturday, March 1 from 9 a.m. to 4 p.m.

  • I-10 East and West will be alternatingly reduced to one lane between Mesa Street and Redd Road.

Crews will be hauling dirt.

Monday, Feb. 24, through Tuesday, Feb. 25 from 9 p.m. to 5 a.m.

  • I-10 West will be closed at Artcraft Road.
    • DETOUR: Take Exit 8 (SH 178/Artcraft Road), continue on North Desert, and re-enter I-10 West past Vinton Road.

Crews will be relocating barriers.

Monday, Feb. 24, through Saturday, March 1 from 9 a.m. to 4 p.m.

  • Redd Road East and West will be alternatingly reduced to one lane at South Desert Boulevard and North Desert Boulevard.

Crews will be conducting electrical work.

Wednesday, Feb. 26, and Thursday, Feb. 27 from 9 p.m. to 5 a.m.

  • I-10 East will be closed at Los Mochis Drive.
    • DETOUR: Continue on South Desert Boulevard, and re-enter I-10 East past Artcraft.

Crews will be relocating barriers.

49-Hour Closure

Saturday, March 1 at 4 a.m., through Monday, March 3 at 5 a.m.

  • I-10 East will be closed at Vinton Road.
    • DETOUR: Take Exit 2 (Spur 37/Vinton Road/Westway Drive), turn right on Vinton Road, left on Doniphan, left on Talbot Avenue, right on South Desert, and re-enter I-10 East past Artcraft.
  • I-10 West closed at Transmountain Road.
    • DETOUR: Take Exit 6A (Loop 375/Transmountain Road), continue on North Desert, and re-enter I-10 West past Vinton Road.
  • South Desert Boulevard will be closed at Los Mochis Drive.

Crews will be opening the I-10 main lanes.

I-10 Widening West 2

Alternating Lane Closures

Monday, Feb. 24 through Saturday, March 1, daily from 9 a.m. to 4 p.m.

  • Alternating lane closures on I-10 East and I-10 West from Anthony, TX to Nashua Road
  • Alternating lane closures on North Desert Boulevard and South Desert Boulevard from Anthony, TX to Nashua Road

Crews will be performing dirt work and removing miscellaneous materials.

Long Term Closure

Through Spring 2026

  • Complete closure at Valley Chile Road Turnaround
    • DETOUR: Southbound traffic will continue on South Desert Boulevard to Vinton Road, make a left on Vinton Road, and make another left onto North Desert Boulevard. Northbound traffic will continue on North Desert Boulevard to Antonio Street, make a left on Antonio Street, and make another left onto South Desert Boulevard.

Crews will be reconstructing and widening the bridge at Valle Chile Road.

Paisano Bridge Replacement

Monday, Feb. 24 through Friday, May 23, 2025

  • Paisano (US-85) westbound between Executive and Doniphan closed

Crews will be working on demolition and bridge work.

Continuous closure

Monday, Feb. 24 through Tuesday, Sept. 16, 2025

  • Paisano (US-85) eastbound between Doniphan and Executive closed

Crews will be working on demolition and bridge work.

Guardrail Repair

Monday, Feb. 24 through Friday, Feb. 28, daily from 9 a.m. to 4 p.m.

  • Loop 375 west- and eastbound between Fonseca and Paisano alternate lane closures

Monday, Feb. 24

  • Loop 375 eastbound between Border Patrol and US-54 right lane closed

Tuesday, Feb. 25

  • I-10 westbound at Piedras on-ramp closed

Thursday, Feb. 27

  • I-10 westbound between Santa Fe and Porfirio Diaz right lane and Santa Fe on-ramp closed

Friday, Feb. 28

  • US-54 (CD Lanes) northbound between Montana and Trowbridge left lane closed

Crews will be working on guardrail.

Spall Repair

Monday, Feb. 24 through Wednesday, Feb. 26 from 9 a.m. to 4 p.m.

  • Doniphan (SH-20) east- and westbound between Sunset and Osborne alternating lane closures

Thursday, Feb. 27 through Friday, Feb. 28, nightly from 9 p.m. to 6 a.m.

  • SH-178 (Artcraft) northbound between Doniphan and I-10 right two lanes closed

Monday, March 3, nightly from 9 p.m. to 6 a.m.

  • SH-178 (Artcraft) southbound between I-10 and Doniphan right two lanes closed

Crews will be working on spall repairs.

Maintenance

Monday, Feb. 24 through Friday, Feb. 28 from 9 a.m. to 4 p.m.

  • Loop 375 east- and westbound between both picnic stations alternate lane closures

Crews will be installing signs.

  • Gateway North between Pershing and Cassidy left lane closed

Crews will be working on erosions.

  • US-54 north- and southbound between Transmountain and Diana alternate lane closures
  • US-54 southbound between Sun Valley and Transmountain entrance ramps and Diana exit ramp closed
  • US-54 northbound at Hondo Pass entrance ramp, Diana entrance ramp, and Sun Valley exit closed
  • US-54 South between Ellerthorpe and Broaddus two left lanes closed
  • Ellerthorpe entrance ramp to US-54 South closed

Crews will be working on spalls and bridge joints.

Montana Widening Project

Monday, Feb. 10 to Saturday, Feb. 22, daily from 9 a.m. to 5 p.m.

  • Montana Avenue eastbound frontage road right lane closure between Lee Trevino Drive and Leticia Drive

Crews will be pouring concrete for bus stop.

Wednesday, Feb. 26 to Saturday, March 1, daily from 9 a.m. to 5 p.m.

  • Montana Avenue westbound frontage road left shoulder closure between Tierra Este Road and Joe Battle Boulevard

Crews will be working on demolition.

Tuesday, March 4 to Friday, March 7, nightly from 9 p.m. to 5 a.m.

  • Full closure Montana Avenue eastbound frontage road from George Dieter Drive to Saul Kleinfeld Drive

Crews will be working on traffic switch.

Purple Heart 375 Widening Project

Monday, Feb. 3 to Friday, Feb. 28, daily from 8 a.m. to 4:30 p.m.

  • Purple Heart Highway (Loop 375) north- and southbound left lane closures between Montana Avenue and Iron Medics Drive

Crews will be paving in the median.

Friday, Feb. 21 from 8 a.m. to 3 a.m.

  • Purple Heart Highway (Loop 375) north- and southbound left lane closures between Montana Avenue and Iron Medics Drive

Crews will be preparing for deck pour on Tank Crossing Bridge ahead of full closure.

Continuous closure

Beginning at 4 a.m. Saturday, Feb. 22 to 5 a.m. Monday, Feb. 24

  • Purple Heart Highway (Loop 375) full closure northbound and southbound from Spur 601 to Montana Avenue
  • Iron Medics turnarounds and ramps will be closed.

Crews will be installing bridge girders.

Continuous closure until further notice

  • Purple Heart Highway north and southbound shoulder closures from Montana Avenue to Spur 601

Crews will be widening main lanes and constructing north and southbound frontage road.

Alameda Mill and Inlay Project

Saturday, Feb. 22 to Friday, Feb. 28, daily from 9 a.m. to 5 p.m.

  • Alameda Avenue (SH-20) east- and westbound alternate lane closures between Glenwood Street and Presa Street.

Crews will be installing small road signs.

Horizon/Darrington Reconstruction Project

Monday, Feb. 24 from 9 a.m. to 2 p.m.

  • Darrington Road northbound will be closed from Eastlake Boulevard to Ryderwood Avenue.
  • Northbound traffic should detour through Ryderwood Avenue for access to Eastlake Boulevard.

Crews will be placing barrier wall along median in preparation for demolition and reconstruction of Darrington Road.

Continuous closures

Friday, Feb. 14 at 4 a.m. until May 2025

  • Horizon Boulevard eastbound complete closure between Horizon Crossing to Breaux Street.

Crews will be working on final subgrade, pavement operations and excavating ponding areas.

Tuesday, Feb. 18 at 4 a.m. until December 2025

  • Darrington Road southbound lanes will become two lanes two-way traffic.
  • Pete La Rue Circle will follow detour entrance at Roslyn Drive and Exit Jasper Drive.

Crews will be working on final subgrade, pavement operations and milling.

Loop 375 Mill and Inlay Project

Monday, Feb. 24 to Friday, Feb. 28, daily from 9 a.m. to 4 p.m.

  • Joe Battle Boulevard (frontage road) north- and southbound alternate lane closures between Pellicano Drive and Montana Avenue
  • Traffic will be reduced to one lane in work areas.

Crews will be constructing northbound and southbound turnaround lanes and installing traffic signals.

I-10 Landscape & Aesthetic Project

Saturday, Feb. 22, daily from 7 a.m. to 3:30 p.m.

  • I-10 westbound at Yarbrough right lane and shoulder closure

Crews will be placing RCP aesthetic.

Daily from 7 a.m. to 3:30 p.m.

  • I-10 eastbound at Zaragoza right lane and shoulder closure

Crews will be removing existing trees.

Monday, Feb. 24 to Friday, Feb. 28, daily from 7 a.m. to 3:30 p.m.

  • I-10 east- and westbound right lane and shoulder closure at Lee Trevino.
  • Gateway East Boulevard right lane closure between Tower Trail Lane and Zaragoza Road
  • I-10 Westbound between Yarbrough Exit Ramp and Yarbrough Entrance Ramp right lane and shoulder closure.
  • I-10 Westbound between Zaragoza Exit Ramp and Zaragoza Entrance Ramp right shoulder closure.
  • Gateway East Boulevard left lane closure between Zaragoza Road and Zaragoza Entrance Ramp.
  • I-10 Westbound between Yarbrough Entrance Ramp and McRae Exit Ramp right shoulder closure.
  • I-10 Westbound McRae Exit Ramp complete closure.
  • Gateway West Boulevard left lane closure between Sumac Drive and McRae Exit Ramp.

Crews will be painting concrete riprap, boring conduit & placing electrical poles, landscaping, and placing concrete riprap.

I-10 at Zaragoza Dynamic Message Sign Maintenance

Friday, Feb. 21 from 9 a.m. to 12 p.m.

  • Right Lane Closure on I-10 West near Zaragoza approaching and after DMS

Closure needed for DMS maintenance.

Closure Links:

West Area Project Closures

I-10 Widening West Closures

East Area Project Closures 

 Read: Read More 

Recent Posts

  • KTSM News – Crash impacting traffic on I-10 outside of Las Cruces
  • Border Report – ICE releases US Army sergeant’s wife after month in custody
  • Border Report – Border Report Live: DACA ‘not enough’ to protect you from arrest, advocates warn
  • KTSM News – ICE releases U.S. Army sergeant’s wife who has been in custody for a month
  • KTSM News – 33-hour closure on I-10 West at Los Mochis to Antonio

El Paso News

El Paso News delivers independent news and analysis about politics and public policy in El Paso, Texas. Go to El Paso News

Politico Campaigns

Are you a candidate running for office? Politico Campaigns is the go-to for all your campaign branding and technology needs.

Go to Politico Campaigns

Custom Digital Art

My name is Martín Paredes and I create custom, Latino-centric digital art. If you need custom artwork for your marketing, I'm the person to call. Check out my portfolio

©2026 Border Blogs & News | Design: Newspaperly WordPress Theme